top of page

Acciona AW116

Client

Acciona

1998

Project

Nacelle development and prototype construction

Work

Design in detail

Engineering

Prototype

AccionaWindpower_AW3000_2.jpg

In the early 2000’s wind farms were sold as “turnkey operations”, an investor bought a generation package of a certain number of KiloWatts and the service operators installed and maintained the park.

ā€‹

This was the case until the business reached the general public and private investors. Wind turbines began to be “sold” as the object that defined the park, therefore the need for differentiation was born and here came the industrial design with new commercial objectives in addition to the usual functionality.

ā€‹

Integral designed, developed and prototyped a total of 7 wind turbines, for various manufacturers, in just under 3 years.

AccionaWindpower_AW3000 (1).jpg
ACCIONA 1.jpg
ACCIONA WINDPOWER EN BRASIL_1_edited.jpg
bottom of page